****Critical Path Management. What Needs to Get Done, and When.****

 

CPM timeline


 

 

__March__

Get schedules from each flatlander: when arrive, what conflicts:

 

choose a version of the Flatland design

 

begin models

 

alert customers about models

 

Research and commit to webcam plan.

need software ,- then hardware- , then system connection (test overload)

 

re-spec materials

 

buy vinyl, begin off-gassing

 

design water and electric connections

 

confirm credit style for our names with Sculpture Center

 

confirm internet needs and provider

 

collect appliances to studio (see list at end)

 

ideas for waterheater?

 

find plumber

 


 

APRIL____

 

APRIL 9

internet and webcam system tests

 

APRIL 14

plumber installs drain and water connecttion, weather permitting

Doug tries internet cams at SC

Doug and Ward go buy appliances

 

APRIL 15-

Assemble bathroom enclosure/

then break down for transport


APRIL 17

meeting meal


APRIL 18

Load-in materials


APRIL 19

cut and paint wood


APRIL 20-

get lift or scaffold

begin building


APRIL 22

test plumbing

install electricity


APRIL 23

video systems


APRIL 24

attach vinyl skin


APRIL 25

bring supplies


APRIL 26

outfit personal spaces

trial night test


APRIL 27

make fixes


APRIL 29

BEGIN FLATLAND

 

 

 

Appliance list


try to get at freecity:

toilet

shower head, mixer

kitchen sink

bathroom sink (flips up, drains in toilet)


Ward has:

microwave

coffemaker

toaster oven

fridge (or 2) (- i've got a fridge, that's a little smaller than full size. it's newish and silver. doug 9.3.7)

vent blowers


Need to find:

dumbwaiter, or at least pulley

double hotplate

 

 

computer for webcam ( -we'll need a dedicated one. i've got one we can use. but it's half as big as the fridge. it's newish and silver. doug 9.3.7)